Photo Gallery
-
Transformer installation in Krasnodar, str. Pervogo Maya
-
Construction of pole arms in Krasnodar, str. Rossiyskaya
-
Construction of power engineering objects for Imeretin Valley power supply as part of the infrastructure building for the 2014 Sochi Winter Olympics
-
Construction of the 330 kV Artyom-Derbent high-voltage line
-
Construction of the 330 kV Gatchinskaya-Luzhskaya high-voltage line from 330kV Luzhskaya substation
-
Engineering documentation drawing up and construction of the 330 kV Artyom-Mozdok high-voltage line from the 330 kV Artyom substation
-
Comprehensive technical upgrading and reconstruction of the 220/110/35/10 kV Pravoberezhnaya substation in Podgornoye, Lipetsk region, Lipetsk Oblast
-
Construction of modular integrated distribution point with modular integrated transformer substation for Yeysk central regional hospital
-
Construction works for two cable lines between Festivalniy and Yubileyniy microdistricts in Krasnodar
-
Modular integrated distribution point for the naval Border Guard troops in Anapa
-
Substation earthing system in Krasnodar, str. Pervogo Maya
-
Design works for transformer and distribution substations and process tie-in to the Krasnodar electrical grids (construction of 10 kV cable line from transformer substation and distribution substation to the modular integrated transformer substation of the Cadet school)